EV Charging Hub, Flamstead

Four Tesla Superchargers added to an existing EG On The Move forecourt at Flamstead, Hertfordshire, one site in the roll-out of charging across the former Applegreen estate.

An EV On The Move rapid charger under a canopy with a car plugged in, a second charger behind, against an evening sky

Project facts

Client
EG On The Move
Location
Flamstead, Hertfordshire
Chargers
Four Tesla Superchargers
Division
EV Charging

Services provided

Sector

Commercial & Roadside

What is the scheme?

Four Tesla Superchargers added to an existing petrol filling station at Flamstead in Hertfordshire, one of the former Applegreen sites now run by EG On The Move. The chargers sit alongside the forecourt and shop, so drivers can charge while they use the facilities that were already there.

The scheme is part of a wider programme. Since EG On The Move acquired Applegreen's UK forecourt estate, it has been adding EV charging across the sites it took on, and we were brought in to help deliver that roll-out. Flamstead is one site in that programme. The design work is about making a repeatable approach fit a specific forecourt.

Why add Tesla Superchargers to a forecourt?

Because the forecourt already has what a charging stop needs: road access, a known location, parking, toilets, food and coffee. A driver charging for 20 to 30 minutes wants somewhere to spend that time, and a forecourt shop turns dwell time into spend. The chargers bring in a new customer, and the existing offer gives them a reason to stay.

Superchargers are a recognised name among EV drivers and are among the most dependable high-power networks in the UK. Many UK Superchargers are now open to non-Tesla vehicles through the Tesla app, so four bays can serve a much wider audience than Tesla owners alone.

What decides whether a charging hub like this works?

Power first. High-power chargers need a large grid supply, and the capacity available at the site, the route of the new connection and where the transformer and cabinets sit all shape the layout before any bay is drawn. On a working forecourt that equipment has to fit around fuel tanks, drainage, delivery routes and the existing buildings without getting in their way.

Then layout and circulation. Charging bays have to be easy to reach and leave, clear of the fuel pumps and the tanker route, and set out so a car parked for half an hour never blocks a car filling up for three minutes. Bay size, cable reach, lighting, accessibility and signage all matter to how the site feels at night and on a busy weekend. Planning looks at the equipment compound, lighting and any effect on neighbours or highway safety, so these points are resolved in the application rather than argued afterwards.

Something like this?

If this scheme resembles your site or your programme, mentioning it is the quickest way to a conversation that gets somewhere.